![]() Of all the samples that have been studied, the fastest is the bricklayer number 9 (nine) whose activity time was 7.69 minutes by using the work method number 2 (two). From the observations of 35 bricklayers regarding work method and activity time of the tile installation, 4 (four) work methods were identified. The recordings of each bricklayer were studied so that a series of activities and the activity time of tile installation can be obtained. On the other hand, an on-site study is performed by recording a number of bricklayers in tile installation. ![]() The method that used in the study of bricklayers in tile installation is a literature study. This study observed the activities of bricklayers in tile installation. From a series of activities that carried out by each craftsman, the time needed to complete a work can be calculated. To achieve both time and quality target of work output, each craftsman use different work method that consists of a series of activities. ![]() The implementation of a construction project consists of several works that carried out by labourer or craftsman in accordance to their specifications of expertise.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
June 2023
Categories |